PROJECT EXPERIENCE
Performed geotechnical studies and geological hazard evaluation for three school facilities (Wasatch Junior High School, Hillsdale Elementary and the Central Kitchen Commissary). Additionally a number of environmental Phase I assessment have been performed at various sites throughout the Salt Lake Valley.
Performed geotechnical studies on two (2) 150,000 square foot buildings (Phase I and Phase I) for manufacturing roofing products and roof membranes. Geotechnical study also included subsurface investigation for a rail spur alignment between the two facilities.
SES performed materials testing and special inspections for new city office building in Vernal, Utah.
Materials testing for new asphalt parking lot. Field-testing services provided included soil density testing, concrete air entrainment and slump, and asphalt density testing. Laboratory testing provided included gradation and Proctor density, concrete compressive strength, asphalt gradation and Marshal density.
|